PREFABRICATED WOOD FRAME

C&V Concept SA offers an industrial concept specializing in the manufacture of timber construction systems — frame walls, roof panels, watertight/airtight assemblies — manufactured in the workshop and then delivered on site.

WATERPROOF | AIRPROOF IN 5 TO 10 DAYS**

INDUSTRIAL PROCESS

A COMPLETE MASTERY

FACTORY – LOGISTICS – CONSTRUCTION SITE

8 – 10 weeks.

Cutting, assembly and quality control in the workshop — in parallel with the foundations.

5 – 10 j.*

Wall erection, roof installation, making the building watertight/airtight.

100 – 116 m²

Individual houses, villas, chalets — adaptable to the geometry of each operation.

100 %

Integrated design, manufacturing, delivery and installation — a single point of contact.

*depending on the project model and configuration

OUR POSITIONING

INDUSTRIAL CONCEPT AND PARTNER FOR YOUR OPERATIONS.

C&V Concept SA offers an industrial concept of prefabricated wood construction systems and positions itself as a project partner for professionals who manage the operation: general contractors, developers, architects.

Our role: to secure your deadlines and guarantee workshop quality on every item delivered.

01

SUPPLIER

Frame walls, roofing, prefabricated units delivered ready to install.

02

PARTNER

Upstream coordination with project management, engineering design offices and general contractors.

03

INDUSTRIAL CONCEPT

Workshop, quality control, traceability — reproducible process.

CONSTRUCTION SITE TIMELINE

FROM LIFTING TO DELIVERY
: A CONTROLLED SEQUENCE.

Once the components are produced in the factory and delivered to the site, the installation takes place in two short and coordinated phases.

PHASE 1

LIFTING & WATERPROOFING | AIRTIGHTENING

5 TO 10 DAYS*

Installation of the frame walls, roof structure and roof panels. Air and water tightness ensured at the end of the phase.

  • Receiving and unloading of components by crane
  • Lifting and assembly of the perimeter walls
  • Installation of the roof frame and roof panels
  • Controlled water/air separation

PHASE 2

STRUCTURAL FINISHES & SHED

2 TO 5 DAYS

Occasional repairs, finishing of connections, handover of the structure for the next phase of work.

  • Finishing of joints and singular points
  • Final leak test
  • Official handover of the watertight/airtight structure

*depending on the project model and configuration

REFERENCES

OUR ACHIEVEMENTS

Overview of programs delivered with our timber construction concept.

& CONTEMPORARY HOUSE

& GROUP HOUSING

& ALPINE CHALETS

& RENTAL RESIDENCE

& VILLA INDIVIDUAL

& WOODED HOUSING

CONTACT

YOU HAVE A PROJECT ?

Send us your operation details, some information(type, area, location).).

We will get back to you with a precise quote and a detailed schedule..